Central Feeding System for Injection Molding Factories
Automated Material Conveying Solution for Efficient and Clean Production
Common Material Handling Challenges in Injection Molding Factories
Manual material feeding
Material contamination
High labor cost
Material management difficulties
How Our Central Feeding System Solves These Problems
Our Central Feeding Solution
Automatic material conveying
Centralized material storage
Central drying system
Clean workshop environment
Reduced labor cost
Stable material supply
Project Case
—— PVC pipe fitting Industry ——
Project details:
- Product: PVC pipe fitting
- Molding machine: IMM
- QTY: 82 units
- Total output: 3480kg/hour
- Material: PVC virgin material, PPR virgin material, crushed material
- Material package: Jumbo bag
- Storage: 4 indoor silos; 2 for crushed material, 2 for virgin material
- Dosing& mixing: gravimetric blender
- Crushing: central crushing and recycling
- Receip: 2 components, virgin material +crushed material